
Introduction: In the face of environmental and energy challenges that the world is currently witnessing, renewable energy sources have become vital for preserving the environment and providing clean and efficient energy. With this in mind, ECD Company embarked on establishing the first solar power system in its camp at the Majnoon Oilfield in order to harness solar energy as a sustainable and alternative source of energy.


Construction Process: The solar system in ECD camp was carefully constructed with a detailed analysis to determine the energy needs of the camp and design the system to meet these requirements. High-efficiency solar panels were installed on the roofs of the buildings in the camp and connected to energy storage systems to ensure the continuous supply of electricity to the camp even in cases of power outages.
