We carried out a complete inspection, commissioning, and activation of an integrated waste management system consisting of industrial incinerators and engineered landfill units. The project scope included PLC-based control systems, SCADA monitoring, fire detection, and full alarm protection systems to ensure safe and compliant operations.

We carried out a complete inspection, commissioning, and activation of an integrated waste management system consisting of industrial incinerators and engineered landfill units. The project scope included PLC-based control systems, SCADA monitoring, fire detection, and full alarm protection systems to ensure safe and compliant operations.

This system enables environmentally responsible waste processing for industrial facilities and supports sustainable field operations. The project was successfully delivered in collaboration with Al-Yamama Engineering, showcasing ECD’s capability in specialized mechanical, electrical, and control-system commissioning.

The expansion enhanced electrical reliability, increased load-handling capacity, and improved the overall performance of the facility’s distribution network. This project demonstrates ECD’s strong capabilities in medium-voltage systems, integrated electrical works, and advanced commissioning services.

Benefits of Project

The implementation of the waste management system provided significant environmental and operational benefits to the facility:

  • Safe and Controlled Waste Processing

  • Reduced Environmental Impact

  • Improved Compliance With HSE Standards

  • Automated Control Through PLC & SCADA

  • Enhanced Fire & Safety Protection

  • Reliable Operation of Incinerator & Landfill Units

  • Long-Term Sustainability for Field Operations

Project Information

Clients:

Al-Yamama Engineering Company

Category:

Waste Management – Incinerator & Landfill System

Date:

2024

Address:

Majnoon Oil Field, Iraq
Contact for inquery

The Challenge Of Project

The project required activating a multi-system waste management facility within an operational oil-field environment. Integration of PLC systems, SCADA monitoring, and fire-protection units demanded precise commissioning, coordination, and strict compliance with environmental and safety regulations. Despite the technical complexity, all systems were tested, integrated, and commissioned successfully.


Project Information

photo_2024 05 24_22 33 12 e1763797347522
photo_2024 08 02_16 01 08 e1763797390769
photo_2024 05 24_22 32 59 e1763797438411
photo_2024 08 02_16 01 03 e1763797569834
photo_2024 05 24_22 33 15 e1763797641935
photo_2024 05 24_22 33 22 e1763797694215
photo_2024 08 02_16 00 58 e1763797739654
photo_2024 05 24_22 32 44 e1763797776291