Engineering Vision for Construction Development L.L.C

Our Projects

we can light everything Nothing Is Impossible For Us

Our Projects

Enabling a more sustainable and resource-efficient future.

Our Projects

The future factory comes in all sizes

Our Projects

ECD-Once, Now, Forever

Our projects

DS2-EHOUSE Project

DS2-EHOUSE Power Station Expansion Project
1- Switchgear Panel Installation: Install a new switchgear panel.
2- Cable Laying and Trenching: - Trench digging for cable installation. - Laying, connecting, and testing power cables, fiber optic cables, and control cables.
3- Testing and Commissioning: - Comprehensive system testing and commissioning.
4- Electrical Component Testing: - Testing CT & PT. - Testing protection relay. - Testing DC contact. - Megger and hi-pot testing. - Settings and configuration.

SAA PROJECT

STATION EXTINTION MAJNOON
1. Installation, testing, and operation of 11kV SWICHGARE and 11LV\400V transformer.
2. Installation, testing, and operation of water pumps.
3. Installation, testing, and operation of DC110V system and instrument devices.
4. Construction of a pump room.
5. Extension of all high-voltage and control cables.
6. Extension of all instruments cables.

WASTE MANAGEMENT - INCINERATOR AND LANDFILL PROJECT

Inspection and commissioning of the waste incinerator in collaboration with Al-Yamama Engineering Company.
Waste incinerator inspection and operation conducted efficiently.
PLC installed for automated control of processes.
SCADA system implemented for real-time monitoring and control.
Assessment Fire and alarm system installed for safety measures.

MAJNOON BRIDGE GATE

Design and packaging of Majnoon Field Gate
The gate should incorporate a modern and appealing design that harmonizes with the environment
Engineers and designers consider environmental and sustainability aspects when designing and encasing the gate.
The construction and installation of the gate be carried out with precision and high professionalism to ensure a long life and optimal performance.

Road Maintenance

Road Maintenance for OHTL 33KV
1- Land modification and leveling
2.Geogrid installation
3. Sub-base layer installation
4. Stone layer spreading
5. Compaction (rolling)
6. Final delivery

OHTL 33 kV from DS2 to WIP

construction of a 33 kV overhead transmission line extending from DS2 to WIP
1- Pile Breaking: Demolition and removal of existing piles to prepare the site.
2-Site Preparation: Clearing and leveling the site to ensure a stable foundation for the transmission line.
3-Blinding Concrete Pouring: Applying a blinding layer of concrete to create a level surface for the foundation.
4-Foundation Pouring: Constructing the foundations for the transmission towers to support the overhead lines.
5-Tower Installation: Installing transmission towers as per specifications for structural integrity and stability.

ECD Contracting Company is a versatile firm specializing in electrical, civil, construction, planning, and engineering works. With a strong focus on quality and innovation,

Quick Links

About

Help Centre

Business

Contact

About Us

Terms of Use

Our Team

How It Works

Accessibility

Support

FAQs

Terms & Conditions

Privacy Policy

Career

Company Info