33kV OHTL DS2 to WIP Project
Steel tower erection, ACSR conductors, OPGW, switchgear, telecom cabinets, fencing, full commissioning.
Steel tower erection, ACSR conductors, OPGW, switchgear, telecom cabinets, fencing, full commissioning.
EPC for 33kV overhead transmission line — switchgear, tower erection, disconnectors, power cables & road maintenance.
Complete water pumping station at Shatt Al Arab — civil, mechanical & electrical works, completed on schedule.
SCADA integration, BFAS, switchgear commissioning, UPS & ATS systems at Majnoon field.
First fully solar-powered camp at Majnoon Oil Field — 100% off-grid, zero diesel dependency.
Power cable replacement between DS2 and FOC substations — manhole construction, trench excavation, cable laying and commissioning.
Long-term workforce agreements for operations and well services including social security and labor compliance.
Full camp construction with accommodation, utilities, power generation and water systems supporting Majnoon civil expansion.
100% off-grid solar camp for accommodation and operations.
EPC delivery of overhead transmission line for AOS and BOC at Majnoon.
Contact ECD Vision for EPC engineering, power systems, and field execution across Iraq.
Get in Touch